Rusting Monuments to Stupidity: Staggering Cost of Cleaning Up the Wind Industry’s Giant Mess


STOP THESE THINGS

The wind industry is like the partying college students that trash their parent’s house, never sparing a thought about cleaning up the mess afterwards.

With subsidies being slashed across the globe, the great wind industry ‘party’ will inevitably draw to a close. And the adults will need to raise the tricky issue about who cleans up the mess? And who pays?

Giant industrial wind turbines have an economic lifespan around 15 years, after which the chances are that they’ll be left to rust in some idiot’s back paddock.

Decommissioning these things properly at a sizeable wind farm would run into the hundreds of millions. Then there’s the toxic waste.

Already, thousands of 45-70m blades are being ground up and mixed with concrete used in the bases of other turbines erected later or simply dumped in landfill. Which should worry locals: the plastics in the blades are highly toxic, and…

View original post 819 more words

One Response to Rusting Monuments to Stupidity: Staggering Cost of Cleaning Up the Wind Industry’s Giant Mess

  1. MaddMedic says:

    But. But..Green!!!

%d bloggers like this: